Home > Buy Now > Wire Mesh > Iron Wire Mesh > Avoid Demolition Template,Fiberglass Mesh
 


AnPing Jinxincheng Wire Mesh Com.,Ltd
 
icon Products

line

icon Company Profile
icon Selling Leads

line

 
Contact us
AnPing Jinxincheng Wire Mesh Com.,Ltd
[China]
Address:
sales@jxc-wiremesh.com Hengshui Hebei 86 China
Phone:
86-0318-8067598
Contact name:
Gao Ying , Manager
Inquire now










AnPing Jinxincheng Wire Mesh Com.,Ltd



 
Products

Avoid Demolition Template,Fiberglass Mesh

Inquire now

Avoid Demolition Template,Fiberglass Mesh

Click to enlarge image

 Origin China
 Model Number complete
 Brand Name jinxincheng

High Ribbed Formwork (also known as demolition of the template-free network) is to use hot-dip zinc steel, according to BSEN 10142 1991 Fe P03GI + FeP02GI Z275 are made of mesh, and their U-section is based on high-tech computerized automation suppressed by the cut Cheng, board surface as a whole made no contact, anti-tension exceptionally strong. Net is easy to heal faster as expendable to a fixed template. When pouring concrete at the back of the template, the Complementary angle mesh embedded in concrete on the film, the formation of a block connected with the neighboring pouring mechanical wedge. The quality of joints is strictly controlled. Aspects of its adhesive and shear strength can be dealt with after a good match rough cut suture.

High Ribbed Formwork features:

1, mechanical performance, the small lateral pressure by the pressure equivalent to a general 60% of the template, it can reduce the amount of template support for 40% of the keel.

2, direct observation of a special casting process because of their mesh, can the naked eye to monitor the casting, and therefore appeared to reduce the risk of pores and cellular

3, light weight, easy transportation and installation of steel weight is only one-tenth of the ordinary type, installation fast, easy to transport.

4, optimization process, Increase the shear interface, when the mortar pouring hole through the mesh grid made of a penetration into the interface shear behavior of a very good coarse-grained interface.

5, easy to wear and continuous reinforcement steel banding from the porous network shut up with a special mesh clouds, a little less force can be reinforced through the use of 12mm. Slightly larger than the diameter of the steel mesh can be cut, to be reinforced through the location after the board will be back. The faster network will also be easy to shut up can be installed in the steel prior to banding, and then may be penetrated through the mesh installed.

6, to adapt to sub-cast concrete, construction of civilization Permanent template, no need to form removal or market manipulation can be bonded joints and to prepare for the next pouring of concrete, so a simplified interface for preparatory work.

7, sockets and more than simple cutting performance, easy cutting, can be requested based on the shape of sticks and inflection mode bending.



icon   Delivery lead time delivery within five days
icon   Minimum order according to customers' demand
icon   Supply ability in abundant supply

Inquire now